Reference: 34638519

High Stell, Middleton St. George, Darlington

High Stell, Darlington

£255,000

bed 3
bath 2

Share this property

Property Description

*** LANDSCAPED REAR GARDEN ***
*** PROFESSIONALLY CONVERTED GARAGE, INTO AN OPEN-PLAN KITCHEN/DINER ***

On the market with Smith & Friends, this stunning three bedroom detached house within the sought after area of Middleton St George. Making this a perfect family home.

The property briefly comprises of; Entrance Hall, Downstairs WC, Good Sized Living Room with bay window, leading through double doors to a separate reception room. The property has had a professional garage conversion to create an open-plan modern kitchen / diner with French Doors to the rear garden.

The first floor provides a landing with three double bedrooms, (Master with Fitted Wardrobes / Units, and Modern En-Suite Shower Room), and a spacious Family Bathroom.

Externally, the property benefits from a low maintenance landscaped rear garden, whilst the front of the property provides ample of off-street parking via a large driveway.

For a viewing contact SMITH & FRIENDS - Estate Agents Darlington, Early viewing is highly recommended.

GROUND FLOOR

Entrance Hall

Measurements: 1.75m x 4.09m (5'09 x 13'05)

Living Room

Measurements: 3.53m x 5.66m (11'07 x 18'07)

Downstairs WC

Measurements: 0.74m x 1.52m (2'05 x 5'00)

Office / Dining Room

Measurements: 3.05m x 2.59m (10'00 x 8'06)

Open-Plan Kitchen / Diner

Measurements: 6.35m x 2.46m (20'10 x 8'01)

FIRST FLOOR

Landing

Measurements: 0.86m x 2.72m (2'10 x 8'11)

Bedroom 1

Measurements: 3.58m x 3.61m (11'09 x 11'10)

En-Suite

Measurements: 1.83m x 2.01m (6'00 x 6'07)

Bedroom 2

Measurements: 2.69m x 3.45m (8'10 x 11'04)

Bedroom 3

Measurements: 2.54m x 2.77m (8'04 x 9'01)

Family Bathroom

Measurements: 2.46m x 2.51m (8'01 x 8'03)

Property Features

  • Ideal family home
  • Landscaped rear garden
  • Master bedroom with en-suite shower room
  • AMPLE OF OFF-STREET PARKING
  • EV CHARGER INSTALLED AT THE PROPERTY
  • NEW BOILER INSTALLED IN JAN 2026